Aphrodite Hills |
PRICE LIST - VILLAS |
CONSTRUCTION COST |
| |
|
|
|
|
|
|
|
|
|
| |
VILLA |
NO. OF |
COVERED AREA m.s. |
TOTAL |
PRICE |
|
|
| |
TYPE |
BEDS |
GR. FLOOR |
1ST FLOOR |
COV. VER. |
AREA |
CY£ |
|
|
| |
THALIA |
2 |
123 |
|
17 |
140 |
211.600 |
|
|
| |
EVTYCHIA |
2 |
131 |
|
3 |
134 |
224.250 |
|
|
| |
ALCYONE |
2 |
74 |
76 |
18 |
168 |
238.050 |
|
|
| |
ANDROMACHI |
2 |
73 |
73 |
15 |
161 |
242.650 |
|
|
| |
CLEO |
3 |
142 |
|
2 |
144 |
228.850 |
|
|
| |
DAPHNE |
3 |
156 |
|
22 |
178 |
265.650 |
|
|
| |
HESTIA |
3 |
90 |
106 |
53 |
249 |
296.700 |
|
|
| |
ATHENA |
3 |
125 |
52 |
28 |
205 |
286.350 |
|
|
| |
MYRTO |
3 |
142 |
73 |
25 |
240 |
318.550 |
|
|
| |
NEFELI |
3 |
141 |
75 |
6 |
222 |
303.600 |
|
|
| |
ARTEMIS |
4 |
131 |
72 |
25 |
228 |
322.000 |
|
|
| |
ARIA |
4 |
178 |
115 |
46 |
339 |
394.450 |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
ALL AREAS QUOTED ARE IN SQUARE METERS |
|
|
|
|
| |
THE VALUE OF THE BUILDING SITE IS NOT INCLUDED |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
TERMS OF PAYMENT |
|
|
| |
1. 25% of the Contract Value (CONSTRUCTION) on Signing, |
|
|
|
| |
2. 15% of the Contract Value Six Months after Signing, |
|
|
|
|
| |
3. 10% of the Contract Value Twelve Months after Signing, |
|
|
|
| |
4. 50% of the Contract Value on DELIVERY of the Villa (UP TO 24 MONTHS FROM SIGNING). |
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
The above prices are subject to change without prior notice at the discretion of the company. |
| |
Interest Rates are subject to change at the discretion of the banking/ financial institutions. |
| |
VILLA OPTIONAL EXTRAS |
|
|
| |
BASEMENTS ARE NOT INCLUDED IN THE VILLA CONSTRUCTION PRICES AS ABOVE.
|
| |
THE FOLLOWING PRICES RELATE TO INCORPORATE BASEMENTS TO THE VILLAS. |
| |
V.A.T. OF 15% IS INCLUDED IN THE EXTRAS PRICE LIST |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
VILLA TYPE |
|
BASEMENT AREA M.S. |
PRICE CYP |
|
|
| |
THALIA |
|
52 |
|
|
44.800 |
|
|
|
| |
EVTYCHIA |
|
43 |
|
|
37.200 |
|
|
|
| |
ALCYONE |
|
46 |
|
|
39.500 |
|
|
|
| |
ANDROMACHI |
35 |
|
|
30.100 |
|
|
|
| |
CLEO |
|
54 |
|
|
46.000 |
|
|
|
| |
DAPHNE |
|
55 |
|
|
47.200 |
|
|
|
| |
HESTIA |
|
45 |
|
|
38.900 |
|
|
|
| |
ATHENA |
|
42 |
|
|
36.600 |
|
|
|
| |
NEFELI |
|
49 |
|
|
41.900 |
|
|
|
| |
ARTEMIS |
|
49 |
|
|
42.500 |
|
|
|
| |
ARIA |
|
63 |
|
|
54.300 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
ATHENA JACUZZI TOWER IS NOT INCLUDED IN THE VILLA CONSTRUCTION PRICE AS ABOVE.
|
| |
THE PRICE TO INCORPORATE THE JACUZZI TOWER TO THE ATHENA VILLA IS CYP 8,000 PLUS V.A.T. |
| |
|
|
|
|
|
|
|
|
|
| |
1. UPGRADED IMPORTED HARDWOOD READY-MADE EXTERNAL DOORS, WINDOWS AND SHUTTERS
|
| |
|
|
|
|
|
|
|
|
|
| |
VILLA TYPE |
|
PRICE CYP |
|
|
|
|
|
| |
THALIA |
|
12.700 |
|
|
|
|
|
|
| |
EVTYCHIA |
|
10.400 |
|
|
|
|
|
|
| |
ALCYONE |
|
16.800 |
|
|
|
|
|
|
| |
ANDROMACHI |
12.100 |
|
|
|
|
|
|
| |
CLEO |
|
12.100 |
|
|
|
|
|
|
| |
DAPHNE |
|
16.800 |
|
|
|
|
|
|
| |
HESTIA |
|
20.700 |
|
|
|
|
|
|
| |
ATHENA |
|
20.400 |
|
|
|
|
|
|
| |
MYRTO |
|
11.800 |
|
|
|
|
|
|
| |
NEFELI |
|
14.750 |
|
|
|
|
|
|
| |
ARTEMIS |
|
18.800 |
|
|
|
|
|
|
| |
ARIA |
|
20.000 |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
2. SWIMMING POOLS |
| |
THE PRICES ARE VALID FOR FLAT BUILDING SITES. |
|
|
|
| |
WHERE THERE ARE EARTHWORKS OR RETAINING WALLS REQUIRED, THOSE WILL |
| |
CHARGED ADDITIONALLY TO THESE PRICES. |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
2a. RECTANGULAR/IRREGULAR SHAPE |
CONCRETE CONSTRUCTION |
|
|
| |
SIZE IN METERS |
|
|
PRICES IN CYP INCLUDING VAT |
|
| |
|
4,00X8,00 |
|
|
18.200 |
|
|
|
|
| |
|
5,00X10,00 |
|
24.000 |
|
|
|
|
| |
|
6,00X12,00 |
|
31.150 |
|
|
|
|
| |
|
4,00X8,00 |
|
|
24.500 |
Overflow type |
|
|
| |
|
5,00X10,00 |
|
30.700 |
Overflow type |
|
|
| |
|
6,00X12,00 |
|
37.300 |
Overflow type |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
2b. OVAL/KIDNEY SHAPE |
|
|
|
|
|
|
| |
SIZE IN METERS |
|
|
PRICES IN CYP INCLUDING VAT |
|
| |
|
4,00X8,00 |
|
|
19.000 |
|
|
|
|
| |
|
5,00X10,00 |
|
24.900 |
|
|
|
|
| |
|
6,00X12,00 |
|
31.850 |
|
|
|
|
| |
|
4,00X8,00 |
|
|
25.700 |
Overflow type |
|
|
| |
|
5,00X10,00 |
|
32.000 |
Overflow type |
|
|
| |
|
6,00X12,00 |
|
38.600 |
Overflow type |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
2c. LAZY "L" SHAPE |
|
|
|
|
|
|
|
| |
SIZE IN METERS |
|
|
PRICES IN CYP INCLUDING VAT |
|
| |
|
5,00X10,00 |
|
24.550 |
|
|
|
|
| |
|
6,00X12,00 |
|
31.150 |
|
|
|
|
| |
|
5,00X10,00 |
|
31.600 |
Overflow type |
|
|
| |
|
6,00X12,00 |
|
37.800 |
Overflow type |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
CONCRETE CONSTRUCTION NOTES: |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
ABOVE PRICES INCLUDE THE FOLLOWING: |
|
|
|
|
| |
Concrete Walls of 0,25mm concrete doubly reinforced. |
|
|
|
|
| |
Walls finished with hydrazzo finish throughout. |
|
|
|
|
| |
Earthworks required. |
|
|
|
|
|
|
|
| |
Electomechanical Equipment Supply and Installation Required, |
|
|
|
| |
Cleaning Equipment(test kit, thermometer, cleaning net, cleaning brush, cleaning vacuum brush) |
| |
Step Ladder, Safety Signs, safety Instructions. |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
DEPTH OF SWIMMING POOLS |
|
|
|
|
|
|
| |
a. Starting at 1,07m to 1,80m maximum depth OR |
|
|
|
|
| |
b. Depth at 1,40m throughout. |
Pump 1.50HP |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
OPTIONAL EXTRAS |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
a. SAFETY COVERS |
(depending on size and shape) |
|
|
|
|
| |
AUTOMATIC |
from CYP 4,150 |
|
|
|
|
|
|
| |
SEMIAUTOMATIC from CYP 3,400 |
|
|
|
|
|
| |
|
|
|
|
|
|
|
PAGE3/4 |
|
| |
|
|
|
|
|
|
|
|
|
| |
b. STEPS |
|
|
|
|
|
|
|
|
| |
Radius corner steps CYP 890.00 |
|
|
|
|
|
|
| |
Rectangular corner steps CYP 890.00 |
|
|
|
|
|
| |
Roman steps CYP 1,300.00 |
|
|
|
|
|
|
| |
Semi-circular internal steps CYP 1,300.00 |
|
|
|
|
|
| |
Rectangular walk in steps of length 1,50m CYP 950.00 |
|
|
|
|
| |
Rectangular walk in steps of length 2,00m CYP 1,060.00 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
NOTE: OTHER SIZES ARE AVAILABLE AND ARE QUOTED ON DEMAND. |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
3. FIREPLACES |
| |
3a. TYPE ONE, Stone dressed with carving, |
|
|
|
|
|
| |
Height 1,15m., Width 1,40m. |
PRICE CYP 3,250.00 |
|
|
|
| |
3b. TYPE TWO, Rough Plaster finish with plaster carving and Marble Top |
|
|
| |
Height 1,03m., Width 1,37m. |
PRICE CYP 2,850.00 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
4. PERGOLAS |
| |
Wooden Pergolas with varnish finish at CYP 148.00 per m.s. |
|
|
|
| |
Gazeppo made of wood with varnish finish at CYP 265.00 per m.s. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
5. VERANDAS and PATHS |
| |
5a. Additional Verandas of Terracota tiles or tiles, supply and installation, at CYP 96.00 per m.s. |
| |
including subgrade |
|
|
|
|
|
|
|
| |
5b. Additional Verandas and Paths of Local Stone 3,0cm thick, supply and installation, 'crazy' |
| |
type at CYP 111.00 per m.s. and 'cut stone' type at CYP132.00 per m.s. including subgrade |
| |
5c. Additional 'dalico' type at CYP 75.00 per m.s. for paths and driveways including subgrade |
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
6. AIR CONDITIONING |
| |
Supply and Installation of A/C units, cold and hot air, individually operated units from CYP 3.200,00 |
| |
(cost can only be determined by the number and size of units which is directly relevant to the |
| |
size of the villa). |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
7. CENTRAL HEATING |
| |
Supply and Installation of Central Heating from CYP 10,000.00 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
8. GARDEN LANDSCAPING |
| |
Design, Supply and Installation of Plants(trees, bushes and flowers) and Irrigation system |
| |
from CYP 9,500.00 |
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
NOTE: EXTRAS AS ABOVE DO NOT INCLUDE VALUE ADDED TAX |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
| |
PRICE LIST NO. 2/ EXTRAS/ 2004/ AMENDMENT 1 |
|
|
|
|
| |
The above prices are subject to change at the discretion of the Company. |
|
|
| |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|